WORK PROCESS

Last updated: Jun 17, 2020  |  1678 Views  |  บทความ

WORK PROCESS

 

 

 
 WORK PROCESS 1
 

The owner set Select the preliminary guidelines direction. Traffic solution for the entrance Waiting area to determine the number of vehicles needed.
Size, type and weight of the car park. Preferred parking Given the need to control the system.
Legal considerations involved. Building permit.
 

 

 

 
   WORK PROCESS 2
Preliminary Design (Conceptual Design).Send an inquiry concerning the increase. Fill amendment and send it back to. Modifications (2) (3) or (4). If necessary, The proposed amendments to be considered.
 
The last time no cases resolved and concluded it. Bids considered a bargain given. Terms of payment plan to order. Foundation design and production planning Structural engineering plan Construction period manufacture Check the production schedule. Product design work started Work permit formation Building and construction control.
 

 

 

  WORK PROCESS 3
SCOPE OF WORK
-Preliminary design work Proliminary design
 

-The work carried out construction permits Work Permit.
 

-Foundation design and structure Foundation and Structural work Design.
 

-Work on the mechanical and electrical systems Mechanical and Electrical Work Design. 
 

-Job qualifications and selection of contractors Bidding Evaluation.
 

-Construction and installation Construction & Installation Work.
 

-Management and Construction Management Construction Management.
 

-Assurance and Testing Commissioning & Test run.
 

-Service Repair and Maintenance Service & Maintenance work.
 

 

 

 WORK PROCESS 4
AFTER SALES SERVICE
The company has been appointed as the operator. And after-sales service Trained Service after the sale of the People's Republic of China and South Korea directly

 

 

 

 

 

 

 

General Automatic Cars Parking System 

 

G-PARK
 

Related content
Powered by MakeWebEasy.com